Retail Park, Greater London

Project: Cork Tree Retail Park, Chingford

System: Repair and renovation of existing system and addition of new high level overflow systems

Date: Completed May 2012

The overall project aim was to completely refurbish the retail park which consisted of more than six different stores. The roof drainage was a priority as the proprietors were experiencing severe leaks throughout the park, causing damage, disruption and hazards. Siphonic Solutions dealt with the works efficiently, ensuring the client requirements were fulfilled.

The remedials included in- depth survey and subsequent replacement of high quality outlets, pipework, tailpipes and joints to the system as well as other components. Siphonic Solutions replaced all main system siphonic gutter outlets and tailpipes. Tailpipes were specifically designed and welded into new branch connections. The existing system also required; repairs to certain components and re- bracketing of siphonic downpipes.

Siphonic Solutions coordinated the works to maximise time, as all of the installation works were undertaken in out of hour’s times to ensure continued trade in the outlets.